Control of the mobile scaffolding should be determined according to the specific situation

Control of the mobile scaffolding should be determined according to the specific situation of the construction, guarantee the construction of normal and orderly. Rachel unloading rod set on the suspension unloading layer, vertical rod and horizontal rod of each intersection are "suspension point".


Cuplock scaffold use, widely used in building construction, in addition to and as a general mobile scaffold, racks, also can be used as a support pillar, material hoisting frame, cantilever scaffold, climbing scaffold. To balance the horizontal thrust at suspension layer, set up in the unloading level pole, roof and wall structure is tight, in the corresponding position of the upper floor embedding Rachel Angle.

 

For concrete strength up to 20 mpa, installed unloading rod Rachel, Rachel, upper stem with Ф 16 round steel, use among Ф 20 basket screw adjustment, lower with 1/2 "steel wire rope, fixed under unloading layer poling bowl below. Mobile scaffolding arrangement need to be determined according to the situation in the construction, to ensure smooth process of construction. Vertical layout mobile scaffolding step height. Mobile scaffolding step frame height from 1.8 m, along the whole build set up 42 steps.